Skip to main content
FREE Delivery!|(601) 706-3281

Road base calculator for Mississippi

Calculate compacted-depth tonnage for lanes and pads, where several inches can add ten tons.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

A lane 100-foot long and 10 feet across with 6 inches of compacted road base calls for about 31 tons. Material needs grow fast on lanes, so free delivery has added value when moving 30 tons can otherwise cost nearly as much as the stone. Road base combines crushed stone and fines in a graded mix, at about 3,000 lb per cubic yard, to form a dense layer beneath roads, driveways, and equipment yards. Use this same calculation for recycled crushed concrete base when the specification permits.

Lane calculations

  1. For a lane, use its centerline length with the average width. For pads, multiply length by width.
  2. Choose 4 inches compacted for light residential use, 6 for daily vehicles and delivery trucks, or 8-12 for weak subgrades and equipment.
  3. Find yards by dividing cubic feet by 27. Multiply yards by 1.5 for tons, then retain +10% for compaction.
Tons = (Length ft × Width ft × Depth in ÷ 12) ÷ 27 × 1.5 × 1.10
Quick figure: one ton ≈ 36 sq ft at 6" compacted

Lane coverage and tonnage

Compacted depth1 ton coversTons per 100 ft of 10-ft lane
4 inches≈ 54 sq ft20.4
6 inches≈ 36 sq ft30.6
8 inches≈ 27 sq ft40.7
12 inches≈ 18 sq ft61.1

Build a lane for wet seasons

  • Clear away organic material before placing base. Topsoil beneath stone will pump mud into the layer regardless of how deep it is placed.
  • Lay woven geotextile over soft or wet subgrade before placing stone. It helps keep the base separate from the soil on a lane.
  • Place no more than 4 inches per lift, then roll each layer before adding another.
  • Slope the finished surface 2-3% outward from the centerline. Rain should run off at the sides, not work down into the base.
  • For a neat, low-dust driving surface, add #57 or driveway gravel on top.
  • Plan on equipment for 20-plus tons. A skid steer or tractor with a box blade can spread the material in an afternoon, while doing it by hand can take a week.

Example: a 100-foot farm lane

A farm lane that is one hundred feet long and ten feet wide, built at 6 inches, comes to 1,000 x 0.5 = 500 cubic feet = 18.5 cubic yards. That is about 28 tons, or 30-31 after the allowance. Material will arrive in two tandem loads. Use two drop points along the run so you can spread downhill instead of hauling stone uphill from a pile at the gate.

Equipment, container, and RV pads

Pads use the same calculation, but axle weight sets the depth. A 12 x 40 RV pad compacted to 6 inches needs about 12 tons. A 20 x 40 equipment yard at 8 inches takes 27. Container weight bears on four corners, so place fabric below a full 8-inch base for container pads, even on sound soil, to keep corners from settling into the surface by spring.

Recycled concrete road base

Recycled concrete base can be used much like virgin road base for compaction and load support, and it may cost less. Review county specifications first, since some call for virgin aggregate. It works for private pads and lanes. Use the same calculation: 1.5 tons per yard, with the same lifts and crown.

Road base by ton or lane

How can I estimate the road base I need?
Convert the area to cubic yards by multiplying length, width, and compacted depth in feet, then dividing by 27. Multiply that result by 1.5 for tons and add 10% for compaction. The calculator already includes the allowance.
What area will 1 ton of road base cover?
At 4 inches compacted, about 54 square feet. At 6 inches, about 36 square feet.
What does 1 yd of road base weigh?
A loose cubic yard weighs roughly 3,000 lb, or 1.5 tons, with greater density after rolling. One tandem truckload is about 10 yards, or 15 tons, per trip.
What road base depth does a driveway need?
For light traffic on firm ground, use four inches after compaction. Make it six for everyday vehicles and delivery trucks. Over clay, wet ground, or equipment parking, use eight to twelve. Add depth before width because a shallow base is the first part to fail.
Road base versus crusher run
Road base and crusher run serve the same general purpose, but their gradations differ. Road base uses a larger stone size for load support, while crusher run is finer for smoother grading. Choose road base for yards and lanes. Choose crusher run for paver bases or close grading. On a standard driveway, compare the price.
Is fabric needed below road base?
No on firm, well-drained subgrade. Yes on clay, including Yazoo clay, or where ruts have formed: woven geotextile separates soil from stone and can halve the stone used by a lane over a decade.

Thirty tons, with no delivery fees.

At lane quantities, road base is sold by the ton and hauled free, where freight often makes up the largest cost.

Shop Road Base

Select material using these figures